New iOS Version of ParkBoston Launched
/
The City of Boston has launched the latest version of our ParkBoston app on the Apple Store (iOS), which allows you to pay for metered spaces across the City. This update will be coming soon to Android devices.

Boston Landmarks Commission Hearing 2/28/2017

The commission will hold its monthly public design review hearing on Tuesday, February 28, 2017.

USE CONGRESS STREET AS AN ENTRANCE/EXIT AFTER 5:30 P.M. 
The public can offer testimony.

Discussion Topics

  1. Design Review - 3 p.m.

    17.431.229      Charles River Esplanade (Lederman Memorial)
    Applicant: Ruth Helfeld, DCR Section Head
    Proposed work: Construction of Lederman Memorial and landscaping; applicant is returning for follow-up from a previous hearing

    17.705.245      Harvard Medical School
    Applicant: Meaghan Doyle, Planner, Harvard University Medical School
    Proposed Work: Installation of new ADA-compliant ramps around the campus quadrangle; applicant is returning for follow-up from a previous hearing

    17.806.35        Charlestown Savings Bank (Cambridge Savings Bank)
    Applicant: Daniel E. Fraine, Senior VP
    Proposed Work: Installation of Cambridge Savings Bank Signage on front and side facades

    17.805.35        Charlestown Savings Bank (Starbucks)
    Applicant: Daniel Brennan, Expeditor
    Proposed Work: install signage on awnings and window decal; installation of patio railing with planter boxes, and new patio furniture; refurbish flag pole and add Starbucks flag

    17.809.141      Sears Building (Landmark Center)
    Applicant: Abe Menzin, SVP of Development
    Proposed Work: landscaping and public realm improvements; interior and exterior building modifications, including the installation of new windows, steel surrounds, and canopies; applicant is returning for follow-up from a previous hearing

    17.724.217      Fowler Clark Epstein Farm
    Applicant: Lisa Lewis, Project Manager
    Proposed Work: Removal and replacement of siding; replacement of windows; restoration of portico; new doors, shutters, fixtures; etc.

    17.810.223      Christian Science Complex (The Mother Church Original and Extension Edifices)
    Applicant: Brooke E. Ten Eyck, Project Manager
    Proposed Work: Stone façade repairs, rebuild balustrades; install protective glazing; replace roof; replace terra cotta

  2. Administrative Review/Approval

    ► Applicants whose projects are listed under this heading NEED NOT APPEAR at the hearing. Please see agenda for details. If you have any questions, please contact staff at 617-635-3850 or BLC@boston.gov

    17.724.217            United Shoe Machinery Building
    Applicant: Siena Construction, General Contractor
    Proposed Work: Replace ATM and equipment, granite floors and millwork in lobby alcove

    Application: 17.733.60 Omni Parker House Hotel
    Applicant: Chris Kelley, Contractor
    Proposed Work: replace corroded steel and flashing; cleaning and coating stucco; isolated repairs of brick masonry and mortar joints

    Application: 17.779.04 Boston Common Brewer Fountain
    Applicant: John Schaub, General Manager
    Proposed Work: temporary installation of bistro tables and chairs and umbrella at Brewer Fountain

    Application: 17.780.04 Boston Common Frog Pond
    Applicant: John Schaub, General Manager
    Proposed work: temporary installation of carousel and ticket booth between parade ground and Frog Pond

    Application: 17.781.04 Boston Common Frog Pond
    Applicant: John Schaub, General Manager
    Proposed work: temporary installation of bistro tables, chairs, and planters at the Frog Pond Pavilion

    Application: 17.807.230 Isabella Stewart Gardner Museum
    Applicant: Michael Holland, Director of Facilities
    Proposed Work: repair and restoration of windows, restoration of balustrades, repointing of chimney, stucco repairs, new roof underlayment, painting and conservation of a plaque on east and west facades

    17.811.114            Ames Building (Cultivar)
    Applicant: Mary Dumont, Lessee
    Proposed Work: Installation of storefronts to match existing and work previously approved by BLC

  3. Business Hearing - 6:00 PM

    1. Discussion and Vote on Design Review Applications

    2. Review and ratification of 01/24/2017 meeting minute

    3. Demolition Delay Hearing: 641 Baker St./990 LaGrange St., West Roxbury, Mass.
    Application #17.393D2125
    Review of proposed demolition of a barn at 641 Baker Street, West Roxbury, Massachusetts

    4.  Property Updates and Staff Reports

  4. Projected Adjournment - 7:15 p.m.